← Back to Feed
Clayton· 44d

Clayton station excavation is well underway with an underground connection to the existing Clayton station.

Crews have launched heavy works at Clayton: four excavators are carving the station box, including two working inside the box and two long‑reach excavators at ground level.

Two large cranes are on site installing the steel beams that form the station box structure beneath the surface.

Workers will excavate an underground connection beneath a concrete roof slab to link the new Clayton station to the existing Clayton station for easier interchanges.

The SRL East project will add six underground stations and connect them by 26 kilometres of twin tunnels, and the says Clayton will become one of ’s busiest transport superhubs linking the , and lines.

Sources 1

‹ Back to your Brief