← Back to Feed
Politics Sunshine· 28d

Planning expert says Melbourne airport rail costs were doctored to favour the Sunshine route.

Jacinta AllanEmily Kulich/Melbourne Press Club — Own work · CC BY-SA 4.0

A planning expert told the royal commission that estimates for ’s airport rail routes were manipulated. The expert says 3.5 kilometres of unnecessary tunnelling added between $3.8 billion and $4.6 billion to the rival route’s estimate.

A 2012 study ranked Maribyrnong first out of 22 routes, with a close second.

The expert’s submission alleges a secret working group was set up at the direction of then-public transport minister to build evidence for the Sunshine route before the 2018 election.

Allan denies the allegations and is expected to be called as a commission witness.

Sources 5

‹ Back to your Brief