# Work starts on links for walkers and cyclists in West Gate Tunnel Project.

Published: 2026-07-14 · Updated: 2026-07-13 · Location: Yarraville, Melbourne, Australia · Sources: 3

## Updates

- 2026-07-13: A 2.5-km veloway from Footscray to Docklands is being installed under the new Footscray Rd motorway, with 40 of 195 segments in place, and a new bridge will replace the Docklands crossing to the Moonee Ponds Creek trail. The project’s major road links are slated to open in late 2025.

## Summary

Construction is beginning on new connections for walking and cycling tied to the West Gate Tunnel Project.

The links will span Footscray Rd and Moonee Ponds Creek, creating continuous paths across these busy corridors.

The project aims to make active travel safer and easier, connecting routes used by commuters and local residents.

Next, crews will build the crossover structures and path connections that tie into the wider network.

## Sources

- North West City News - Latest: [North West City News tours the West Gate Tunnel Project](https://www.northwestcitynews.com.au/north-west-city-news-tours-the-west-gate-tunnel-project)
- Docklands News - Latest: [Construction of walking and cycling crossover to begin as part of West Gate Tunnel works](https://www.docklandsnews.com.au/construction-of-walking-and-cycling-crossover-to-begin-as-part-of-west-gate-tunnel-works-1)
- Northern: [Explore Ziebell’s Farmhouse Museum during Open House Melbourne](https://northern.starweekly.com.au/news/explore-ziebells-farmhouse-museum-during-open-house-melbourne/)

---

Summary written by Brief (itsbrief.com) from the reporting linked above. Canonical page: https://itsbrief.com/story/work-starts-on-links-for-walkers-and-cyclists-in-west-gate-395d1062
More Yarraville news: https://itsbrief.com/local/yarraville
