# Whyalla desalination plan opens consultation with 1,992 hectares of native vegetation set for clearing.

Published: 2026-10-30 · Location: Whyalla, South Australia · Sources: 1

## Summary

The proposed plant would produce up to 51 GL of water a year for BHP’s expanded Olympic Dam and Carrapateena mines.

The project is expected to generate 2000 construction jobs; its Environmental Impact Statement estimates the equivalent of $3.3 billion annually for the South Australian government.

The plant’s outfall would return discharge to the Spencer Gulf. The Environmental Impact Statement says potential impacts are expected to be localised near the diffuser, predominantly over sandy habitats.

## Sources

- perthnow.com.au: [Desal plant a 'green boost' despite bushland disruption](https://www.perthnow.com.au/news/business/energy/desal-plant-a-green-boost-despite-bushland-disruption-c-23094708)

---

Summary written by Brief (itsbrief.com) from the reporting linked above. Canonical page: https://itsbrief.com/story/whyalla-desalination-plan-opens-consultation-with-1-992-6bf3de2e
