# NSW audit finds $63.7 million in facilities cut from Albury-Wodonga hospital project.

Published: 2026-11-12 · Location: Albury, New South Wales, Australia · Sources: 2

## Summary

The $558 million redevelopment was budgeted before its full needs and costs were known, the audit found.

The cuts removed a paediatric unit, operating theatres and a helipad; the theatres and paediatric spaces were left as cold shells, without power, plumbing, ceilings or clinical fitouts.

The audit found NSW hospital-building budgets were routinely approved before preliminary or full business cases were developed, and made six recommendations for implementation by November 2027.

## Sources

- The Border Mail: [How to build a hospital: report highlights millions cut from redevelopment](https://www.bordermail.com.au/story/9390374/auditor-general-report-into-albury-wodonga-hospital-redevelopment)
- Sydney Morning Herald - Culture: [Missing operating theatres and wards with no ceilings: How NSW’s hospital builds stay under budget](https://www.smh.com.au/national/nsw/missing-operating-theatres-and-wards-with-no-ceilings-how-nsw-s-hospital-builds-stay-under-budget-20261112-p61dlu.html)

---

Summary written by Brief (itsbrief.com) from the reporting linked above. Canonical page: https://itsbrief.com/story/nsw-audit-finds-63-7-million-in-facilities-cut-from-albury-2e10b3f0
