# New 1.4 kilometres of elevated bikeway lets people bypass four busy Adelaide roads.

Published: 2026-09-27 · Updated: 2026-09-28 · Location: Adelaide, Australia · Sources: 2

## Summary

The final elevated sections of the Mike Turtur Bikeway — nearly 1.4 kilometres in length — have opened to the public, allowing cyclists and pedestrians to travel above the tram corridor for the first time.

The paths let walkers, runners and riders bypass four roads — South, Marion, Cross and Morphett — running along the tramline between the city and Glenelg.

Before the level crossings were removed, boom gates were down for up to 20 minutes per hour, disrupting about 50,000 vehicles daily at Marion/Cross and 25,600 at Morphett Road.

The elevated paths are part of the Tram Grade Separation Projects, a nearly $870 million program jointly funded by the Albanese and Malinauskas Governments.

A new push button crossing will also be installed on Morphett Road to improve access to community spaces and local businesses beside the new overpass.

## Sources

- Ministers for the Department of Infrastructure: [Safer journeys for South Australians: works begin on upgrading Heaslip Road and Curtis Road intersection](https://minister.infrastructure.gov.au/c-king/media-release/safer-journeys-south-australians-works-begin-upgrading-heaslip-road-and-curtis-road-intersection)
- Ministers for the Department of Infrastructure: [Elevated experience for cyclists as upgraded Mike Turtur Bikeway opens](https://minister.infrastructure.gov.au/c-king/media-release/elevated-experience-cyclists-upgraded-mike-turtur-bikeway-opens)
- Glam Adelaide: [NOW OPEN: New 1.4km elevated bikeway connects Adelaide to Glenelg](https://glamadelaide.com.au/now-open-new-1-4km-elevated-bikeway-connects-adelaide-to-glenelg)

---

Summary written by Brief (itsbrief.com) from the reporting linked above. Canonical page: https://itsbrief.com/story/new-1-4-kilometres-of-elevated-bikeway-lets-people-bypass-8f4019f6
More Adelaide news: https://itsbrief.com/local/adelaide
