# NBN and Victoria plan full-fibre upgrades across 70 regional towns.

Published: 2026-10-28 · Updated: 2026-10-29 · Location: Victoria, Australia · Sources: 2

## Summary

Around 1,700 homes and businesses in Horsham, Dimboola, Donald, Warracknabeal, St Arnaud, Kerang and Stawell are expected to benefit.

The connections could offer download speeds of up to one gigabit per second.

Construction is already underway outside Ballarat, and all locations are expected to be ready to connect by December 2030.

## Sources

- Gippsland Times: [Stillsfibrehaul25_01224 | Gippsland Times](https://www.gippslandtimes.com.au/news/2026/11/04/nbn-full-fibre-expansion/attachment/stillsfibrehaul25_01224)
- Gippsland Times: [NBN full fibre expansion | Gippsland Times](https://www.gippslandtimes.com.au/news/2026/11/04/nbn-full-fibre-expansion)
- Wimmera Mallee News: [nbn fibre network expanding in Wimmera](https://www.warrackherald.com.au/nbn-fibre-network-expanding-in-wimmera-2026-10-29)

---

Summary written by Brief (itsbrief.com) from the reporting linked above. Canonical page: https://itsbrief.com/story/nbn-and-victoria-plan-full-fibre-upgrades-across-70-regional-f0b6cc08
