# Ballarat council approves $3.3 million roundabout for problems caused by rail crossing closure.

Published: 2026-11-26 · Location: Wendouree · Sources: 1

## Summary

Ballarat councillors approved the contract on Wednesday for a roundabout at Ring Road and Trewin Street in Wendouree, where motorists have faced traffic and safety problems.

The Ring Road rail crossing closed permanently to make way for a freight hub. Motorists travelling between Alfredton and Wendouree were redirected onto Ballarat Link Road, adding pressure to the Trewin Street connection.

The council expects the roundabout to improve traffic flow and safety, and access to nearby businesses. Construction is expected to cause traffic disruptions.

Fulton Hogan Industries will build it, with completion expected by mid-2027.

## Sources

- The Courier - Local News: [Council approves $3.3m roundabout to fix 'bottleneck' from Ring Rd closure](https://www.thecourier.com.au/story/9398432/ballarat-council-awards-contract-for-new-ring-road-roundabout)

---

Summary written by Brief (itsbrief.com) from the reporting linked above. Canonical page: https://itsbrief.com/story/ballarat-council-approves-3-3-million-roundabout-for-f749c666
