# ARENA commits $15 million to a $30 million green-hydrogen steelmaking pilot in Victoria.

Published: 2026-11-04 · Updated: 2026-11-05 · Location: Victoria, Australia · Sources: 2

## Summary

The pilot will test Australian-developed technology designed to lower green-hydrogen costs and reduce steelmaking emissions.

Hadean Energy will build and operate the plant, earmarked for a BOC facility in Hastings, south-east of Melbourne; its hydrogen is intended for a neighbouring steelmaking facility.

The plant is expected to produce up to seven kilograms of hydrogen per hour and supply around 85 per cent of the hydrogen needed for an annealing process.

Hadean estimates the technology can use around 30 per cent less electricity than conventional electrolysers by using waste industrial heat.

## Sources

- AAP News: [Optimism for hydrogen pilot in race to green steel](https://aapnews.aap.com.au/news/optimism-for-hydrogen-pilot-in-race-to-green-steel)
- miragenews.com: [Australia Backs Hydrogen Innovation for Low-Emissions Steel](https://www.miragenews.com/australia-backs-hydrogen-innovation-for-low-1772123)
- miragenews.com: [Australian Hydrogen Tech Backs Steelmaking Pilot](https://www.miragenews.com/australian-hydrogen-tech-backs-steelmaking-pilot-1772107)

---

Summary written by Brief (itsbrief.com) from the reporting linked above. Canonical page: https://itsbrief.com/story/arena-commits-15-million-to-a-30-million-green-hydrogen-15ce40c0
