← Back to Feed
Ballan· 24d

A safety upgrade begins on a stretch used by 13,000 vehicles a day.

About 13,000 vehicles use the one-kilometre -bound stretch near Pykes Creek Reservoir every day; work has begun on its $21 million upgrade.

The existing road winds uphill, creating dangerous conditions and requiring drivers to slow down.

The lanes will be realigned and replaced with two wider lanes, with the upgrade intended to support a consistent 110km/h speed limit. It is expected to be completed by mid-2027.

Sources 1

‹ Back to your Brief